Kondisi Pembangkit PLTU Baturaja 17 Oktober 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area work shop
  2. Inspeksi All Weighing conveyor
  3. Inspeksi kompresor SULLAIR
  4. Repair kebocoran line transfer ash silo.
  5. Inspeksi ESP
  6. Reinstall pin turbine #1 & #2
  7. Perbaikan flange gelas pantau Inlet SC IDF #4
  8. Perbaikan Roller Screen !A
  9. Lanjut perbaikan tangga WTP

Electrik

  1. Check Oxigen Analizer
  2. Check Komunikasi ICP dari Slag drag Sampling
  3. Daily motor
  4. Continue grace motor
  5. Chek dan perawatan sistem pendingin
  6. Chek dan perawatan grounding

Chek kerusakan kabel kontrol sampling swas

Chek kerusakan analysis oxigen boiler 1 dan 2

Daily panel distribusi room

Perawatan grease motor fwp dan idf

Leave a Reply

Your email address will not be published. Required fields are marked *