Kondisi Pembangkit PLTU Baturaja 20 Oktober 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area work shop
  2. Inspeksi All Weighing conveyor
  3. Inspeksi kompresor SULLAIR
  4. Inspeksi ESP
    Setting Dumpre Valve #4
    Ganti Valve hopper #4
    Cek Vessel #5
  5. Melakukan pengecekan dan perawatan pompa ponton.
  6. Melanjutkan pekerjaan perbaikan lantai WTP.
  7. Melakukan cleaning debu pada unit IDF #1 dan IDF #2.
  8. Perbaikan Roller Screen 1A
    -Repair back rail
    -Repair crack pada Beam support block bearing
  9. Repair kebocoran line transfer Ash silo

Elektrik

  1. Repair indications parameter Ampere PAF 1 Boiler #2.
  2. Pabrikasi Front Cover COS Ponton
  3. continue daily cek motor
  4. ganti lampu tl room panel demin

SPB
Nihil

perbaikan pembacaan ampere motor