Kondisi Pembangkit PLTU Baturaja 27 Oktober 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area work shop
  2. Inspeksi All Weighing conveyor
  3. Inspeksi kompresor SULLAIR
  4. Lanjut perbaikan Roller Screen #1A
    Reposisi Gearbox
  5. Repair kebocoran line transfer Ash Silo
  6. Perbaikan pompa ponton

Elektrik

  1. Perawatan panel ESP
  2. Perawatan panel Waterpond

SPB
1. Rev PR NO. 0165

Perawatan ponton PLTU di pinggir sungai ogan