Kondisi Pembangkit PLTU Baturaja 6 November 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Maintenance
Mekanik
- Cleaning area workshop
- Inspeksi All Weighing conveyor
- Inspeksi kompresor SULLAIR
- Fabrikasi doubling plate elbow Ash silo
- Agenda WTP
Penggantian frame dan plate lantai WTP.
Melekukan pengecekan lompa ponton. - PM. Boiler
Melakukan penambahan oil block bearing IDF #2 dan #4.
Melakukan perawatan H/E . - Inspeksi Ring Hammer #1B
Elektrik
- Chek accu loader
- Penggantian selang Esp botol #4
- Support switching auxiliary
- Perawatan panel speed Paf, Saf
- Chek modul ampere Condensate 1 turbin 1
- Daily maintenance
SPB
Nihil