Kondisi Pembangkit PLTM Lahat 7 November 2023

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 2)
Turbine 2 = ON (0 – 17)
Turbine 3 = Off (0 – 17)

SPB
Nihil
Maintenance
pemasangan tapak shoe pada link track baru hitachi long arm
pergantian idler hitachi long arm
perbaikan gear pintu penguras HP

Leave a Reply

Your email address will not be published. Required fields are marked *