Kondisi Pembangkit PLTM Lahat 18 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = OFF (0 – 0)
Turbine 3 = ON (0 – 24)
SPB
Nihil
Maintenance
renovasi pos satpam kantor kayu
Normalisasi bendung
pergantian aki N 100 exca 320 D
Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = OFF (0 – 0)
Turbine 3 = ON (0 – 24)
SPB
Nihil
Maintenance
renovasi pos satpam kantor kayu
Normalisasi bendung
pergantian aki N 100 exca 320 D