Kondisi Pembangkit PLTU Baturaja 21 November 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Maintenance
Mekanik
- .Rakor Persiapan OH Desember 2023
- Cleaning area workshop
- Inspeksi All Weighing conveyor
- Inspeksi kompresor SULLAIR
- P/M Boiler & Turbin
Penambahan oil block bearing IDF #2 & #4
Pemasangan bak penampungan oil Sementara pada area dibawah flexible joint turbine #1. - P/M WTP
Perbaikan pipa bocor pada line R/O 1 B
Pembuatan pintu tools box WTP
Melakukan perawatan pompa suply UF, R/O, Demin dan cleaning areanya - Fabrikasi Elbow doubling plate Part
- Continous Repair Compressor FEIHE #2
Dismantling & Cleaning Air End Parts - Repair kebocoran line transfer ash silo
Area top mini silo
Elektrik
- Test inverter alat kalibrasi Belt conveyor weighing
- Lubrication motor motor induced fan dan feed water pump
- Rakor persiapan OH Desember 2023
- Pengecekan kabel power area coal handling
SPB
Mekanikal seal HP pump RO