Kondisi Pembangkit PLTU Baturaja 22 November 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area workshop
  2. Inspeksi All Weighing conveyor
  3. Inspeksi kompresor SULLAIR
  4. P/M TURBIN #1
    Fabrikasi maintenance dact untuk buka tutup/ change vacoom
  5. Install Elbow line transfer ash silo
    Jalur #6 area belakang kompresor lama
  6. ESP
    Repair vessel #5

Elektrik

  1. chek dan perbaikan botol 5 esp abnormal alarm
  2. Chek penangkal petir Mpb area dan chimney
  3. Support power team mekanik p. adji area WJT1
  4. Test module baru tonase weghing
  5. Daily maintenance

SPB
Nihil