Kondisi Pembangkit PLTU Baturaja 23 November 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area workshop
  2. Inspeksi All Weighing conveyor
  3. Inspeksi kompresor SULLAIR
  4. P/M TURBIN
    Melanjutkan fabrikasi maintenance dact diatas water jet tank.
    Flashing H/E feed pump
  5. Cleaning scrap ex Install Elbow line transfer ash silo
  6. Inspeksi ESP hopper #5
  7. Repair kebocoran line Transfer Ash silo
  8. Repair kebocoran hopper transfer R/S to B/C #2

Elektrik

  1. Continue Check kontrol ESP Botol 5
  2. 2.Daily Parameter STG 2.
  3. 3.Continue chek protection grounding Mpb dan office
  4. 4.Continue repair Cctv gudang

SPB
Nihil

Leave a Reply

Your email address will not be published. Required fields are marked *