Kondisi Pembangkit PLTM Lahat 27 November 2023

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 22)
Turbine 2 = ON (0 – 23)
Turbine 3 = ON (0 – 23)

SPB
Nihil
Maintenance
Normalisasi bendung
pemasangan Optik termibal box di GH
perbaikan exca hitachi
pemasangan/ perbaikan otomatis pintu penguras ( alat sensor )

Leave a Reply

Your email address will not be published. Required fields are marked *