Kondisi Pembangkit PLTM Lahat 28 November 2023

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = ON (0 – 24)
Turbine 3 = ON (0 – 23)

SPB
Nihil
Maintenance
Normalisasi bendung
perbaikan AC ruang HRD
Pengecekkan rembesan pada bagian sebrang jalan inspeksi sta 550

Leave a Reply

Your email address will not be published. Required fields are marked *