Kondisi Pembangkit PLTU Baturaja 30 November 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area workshop
  2. Inspeksi All Weighing conveyor
  3. Inspeksi kompresor SULLAIR
  4. Install pipa ceramic liner line transfer ash silo area top main silo
    Jalur #3
  5. Inspeksi ESP Vessel # 5
  6. Repair screen R/H
  7. Melakukan penambahan oil block bearing all IDF
  8. Melakukan Fabrikasi pipa return SC ke Reservoar

Elektrik

  1. Perawatan Panel Area Cwp
  2. Check & Repair Speed Sensor speed FWP Pump 3.
  3. pengukuran kabel power ponton
  4. perapian kabel ethernet area camney
  5. Continue perawatan ac area camney, esp dan crusher
  6. Daily maintenance

SPB
Nihil