Kondisi Pembangkit PLTM Lahat 9 Desember 2023

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = ON (0 – 24)
Turbine 3 = ON (0 – 24)

SPB
Nihil
Maintenance

  • Normalisasi bendung dengan alat exca 330 dan 210
  • pemasangan monitor CCTV di ruang CCR

Leave a Reply

Your email address will not be published. Required fields are marked *