Kondisi Pembangkit PLTU Baturaja 13 Desember 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24)
STG 2 = OFF

Maintenance
Mekanik

  1. Repair ESP #2
    Support electrical repair isolator Rod No.6
    repair Hopper plate No.5 dan No.6
    Repair deck isolator room
  2. Cleaning Burner boiler #2
  3. Cleaning ducting PAF & SAF
  4. Repair Valve di Elv.32
  5. Pemindahan jip gantry dari sand filter #3 ke sand filter #1
  6. Melakukan perbaikan sand filter #1
  7. Repair kebocoran pada casing IDF #3 Dan #4
  8. Repair kebocoran bottom header pipa level drumb boiler#2
  9. Repair kebocoran valve superheater to sampling room
  10. Repair kebocoran gasket venting valve main desuperheater boiler#2

Elektrik

  1. Suport team subkon transformer
  2. Repair PC op#2
  3. Repair collecting elektrode Wsp#2
  4. Repair lighting area esp & idfan
  5. cek dan pengukuran busbar 380 V dan 6 KV
  6. Merger insulating main power transformer

SPB
1.konsumable OH unit#2 ( lokal)

Progres OH unit #2 PLTU baturaja 13 desember 2023

  1. Stop Boiler 2, 100 %
  1. Cooling boiler, ESP, drain debu ESP 2, 100%
  2. Cleaning ESP 2 (Drain), 90%
  3. Pengecekan Isolator dan Heater ESP 2 100 %
  4. Perbaikan Collecting Plate dan Elektroda, 50 %
  5. Perbaikan (penggantian) gasket manual valve Superheater Boiler #2 Elv. 32, 100%
  6. Perbaikan (penggantian) gasket manual valve Bypass MainSteam Boiler #2 Elv. 32, 100%
  7. Perbaikan (penggantian) manual valve venting MainSteam Boiler #2 Elv. 32, 100 %
  8. Pengecekan (perbaikan) Valve Steam Blow Boiler #2, 50%
  9. Pengecekan (perbaikan) sensor level Drum boiler 22, 50%
  10. Pengecekan Air Heater Boiler 2, 100%
  11. Cleaning Burner Boiler, 2, 100,%
  12. Cleaing Nozle Furnace Boiler 2, 100%
  13. Cleaing Nozle Solar Boiler. 0 %
  14. Start Boiler 2. 0%
    TURBINE
  15. Stop Turbine #2, 100%
  16. Pengecekan (Perbaikan) rembesan Oli Pilot Tranduser Turbine #2, 0%
  17. Pengecekan (penggantian) manual valve bypass Inlet Economizer di Elv. 7, 0 %
  18. Purifikasi & Perbaikan Trafo 20KV, 50 %
  19. Cleaning Oil Cooler 1&2, 0%
  20. Cleaning Air Cooler Generator 100%
  21. Start Turbine 2, 0 % TANPA PADAM UNIT
  22. Cleaning Sand Filter, 100 %
  23. Perbaikan Pondasi Ring Hammer, 65%

Additional work

  1. Repair deck plate area isolator Esp#2