Kondisi Pembangkit PLTM Lahat 14 Desember 2023

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = ON (0 – 24)
Turbine 3 = ON (0 – 24)

SPB
Nihil
Maintenance

  • Normalisasi bendung dengan alat exca 330 dan hitachi 210
  • service rutin DT hino fuel
  • pembersihan server, ups
  • pembersihan AC ruang rapat

Leave a Reply

Your email address will not be published. Required fields are marked *