Kondisi Pembangkit PLTM Lahat 18 Desember 2023

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 19)
Turbine 2 = ON (0 – 20)
Turbine 3 = ON (0 – 19)

SPB
Nihil
Maintenance

  • Normalisasi bendung dengan alat exca 330 dan hitachi 210
  • perbaikan genset bendung foton
  • pengecekkan dan pergantian batrai ( 2 batrai 200A ) buckup.

Leave a Reply

Your email address will not be published. Required fields are marked *