Kondisi Pembangkit PLTU Baturaja 20 Desember 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON ( 0 – 24 )
Maintenance
Mekanik
- Repair kebocoran line transfer Ash silo
Area deck mini silo
Area Dumper main silo - Repair Vessel tank No.4
Ganti gasket T/V - Penggantian scrapper Exavator mini
- Inspeksi Conveyor weighing
- Fabrikasi portal untuk area DCS 1 arah tambang
Elektrik
- Daily activities elektrik
- Fabrikasi special tool repair
motor FWP#4 - Repair monitor untuk backup monitoring Demin
SPB
Nihil