Kondisi Pembangkit PLTGU MUSI II 17 September 2023 Kondisi Operasi Mesin GTG 1 = ON (14-24) GTG 2 = OFF…
Kondisi Pembangkit PLTM Cibuni 16 September 2023 Kondisi Operasi Mesin Turbine 1 = ON (0-24) Turbine 2 = OFF (0-24)
Kondisi Pembangkit PLTM Endikat 16 September 2023 Kondisi Operasi Mesin Turbine 1 = OH Turbine 2 = OH Turbine 3…
Kondisi Pembangkit PLTM Lahat 16 September 2023\ Kondisi Operasi Mesin Turbine 1 = OH Turbine 2 = OH Turbine 3…
Kondisi Pembangkit PLTU Baturaja 16 September 2023 Kondisi Operasi Mesin STG 1 = ON (0-24) STG 2 = ON (0-24)
Kondisi Pembangkit PLTGU MUSI II 16 September 2023 Kondisi Operasi Mesin GTG 1 = ON (14-24) GTG 2 = OFF…
Kondisi Pembangkit PLTM Cibuni 15 September 2023 Kondisi Operasi Mesin Turbine 1 = ON (0-24) Turbine 2 = OFF (0-24)
Kondisi Pembangkit PLTM Endikat 15 September 2023 Kondisi Operasi Mesin Turbine 1 = OH Turbine 2 = OH Turbine 3…
Kondisi Pembangkit PLTM Lahat 15 September 2023 Kondisi Operasi Mesin Turbine 1 = OH Turbine 2 = OH Turbine 3…
Kondisi Pembangkit PLTU Baturaja 15 September 2023 Kondisi Operasi Mesin STG 1 = ON (0-24) STG 2 = ON (0-24)