Kondisi Pembangkit PLTGU MUSI II 7 September 2023 Kondisi Operasi Mesin GTG 1 = ON (8-16) GTG 2 = ON…
Kondisi Pembangkit PLTM Cibuni 6 September 2023 Kondisi Operasi Mesin Turbine 1 = OFF (0-24) Turbine 2 = ON (0-24)
Kondisi Pembangkit PLTM Endikat 6 September 2023 Kondisi Operasi Mesin Turbine 1 = ON (0-24) Turbine 2 = OFF Turbine…
Kondisi Operasi Mesin Turbine 1 = ON (0-24) Turbine 2 = ON (0-24) Turbine 3 = OFF
Kondisi Pembangkit PLTU Baturaja 6 September 2023 Kondisi Operasi Mesin STG 1 = ON (0-24) STG 2 = ON (0-24)
Kondisi Pembangkit PLTGU MUSI II 6 September 2023 Kondisi Operasi Mesin GTG 1 = ON (8-16) GTG 2 = ON…
Kondisi Pembangkit PLTM Cibuni 5 September 2023 Kondisi Operasi Mesin Turbine 1 = OFF (0-24) Turbine 2 = ON (0-24)
Kondisi Pembangkit PLTM Endikat 5 September 2023 Kondisi Operasi Mesin Turbine 1 = ON (0-24) Turbine 2 = OFF Turbine…
Kondisi Pembangkit PLTM Lahat 5 September 2023 Kondisi Operasi Mesin Turbine 1 = ON (0-24) Turbine 2 = ON (0-24)…
Kondisi Pembangkit PLTU Baturaja 5 September 2023 Kondisi Operasi Mesin STG 1 = ON (0-24) STG 2 = ON (0-24)