Kondisi Pembangkit PLTM Lahat 23 November 2023
Kondisi Pembangkit PLTM Lahat 23 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = OFF (0 – 0)
Turbine 3 = ON (0 – 24)
Monitoring All Power Plant Manggala
OM Report PLTM Green Lahat
Kondisi Pembangkit PLTM Lahat 23 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = OFF (0 – 0)
Turbine 3 = ON (0 – 24)
Kondisi Pembangkit PLTM Lahat 22 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = OFF (0 – 0)
Turbine 3 = ON (0 – 24)
Kondisi Pembangkit PLTM Lahat 21 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = OFF (0 – 0)
Turbine 3 = ON (0 – 24)
Kondisi Pembangkit PLTM Lahat 20 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = ON (0 – 2)
Turbine 3 = ON (0 – 24)
Kondisi Pembangkit PLTM Lahat 19 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = OFF (0 – 0)
Turbine 3 = ON (0 – 24)
Kondisi Pembangkit PLTM Lahat 18 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = OFF (0 – 0)
Turbine 3 = ON (0 – 24)
Kondisi Pembangkit PLTM Lahat 17 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = ON (0 – 23)
Turbine 3 = ON (0 – 22)
Kondisi Pembangkit PLTM Lahat 16 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 23)
Turbine 2 = ON (0 – 23)
Turbine 3 = ON (0 – 18)
Kondisi Pembangkit PLTM Lahat 15 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 20)
Turbine 2 = ON (0 – 21)
Turbine 3 = ON (0 – 8)
Kondisi Pembangkit PLTM Lahat 14 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = ON (0 – 24)
Turbine 3 = OFF (0 – 0)