Kondisi Pembangkit PLTM Cibuni 7 November 2023
Kondisi Pembangkit PLTM Cibuni 7 November 2023
Kondisi Operasi Mesin
Turbine 1 = OFF (0-24)
Turbine 2 = ON (0-24)
Monitoring All Power Plant Manggala
Kondisi Pembangkit PLTM Cibuni 7 November 2023
Kondisi Operasi Mesin
Turbine 1 = OFF (0-24)
Turbine 2 = ON (0-24)
Kondisi Pembangkit PLTM Endikat 7 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-20)
Turbine 2 = ON (0-3)
Turbine 3 = ON (0-21)
Kondisi Pembangkit PLTM Lahat 7 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 2)
Turbine 2 = ON (0 – 17)
Turbine 3 = Off (0 – 17)
Kondisi Pembangkit PLTU Baturaja 7 November 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Kondisi Pembangkit PLTGU MUSI II 7 November 2023
Kondisi Operasi Mesin
GTG 1 = ON (0-24)
GTG 2 = ON (0-24)
GTG 3 = ON (8-24)
STG = OFF
Kondisi Pembangkit PLTM Cibuni 6 November 2023
Kondisi Operasi Mesin
Turbine 1 = OFF (0-24)
Turbine 2 = ON (0-24)
Kondisi Pembangkit PLTM Endikat 6 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = ON (0-7)
Turbine 3 = ON (0-22)
Kondisi Pembangkit PLTM Lahat 6 November 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0 – 7)
Turbine 2 = ON (0 – 23)
Turbine 3 = Off (0 – 23)
Kondisi Pembangkit PLTU Baturaja 6 November 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Kondisi Pembangkit PLTGU MUSI II 6 November 2023
Kondisi Operasi Mesin
GTG 1 = ON (0-24)
GTG 2 = ON (0-24)
GTG 3 = OFF
STG = OFF