Kondisi Pembangkit PLTGU MUSI II 30 Agustus 2023
Kondisi Pembangkit PLTGU MUSI II 30 Agustus 2023
Kondisi Operasi Mesin
GTG 1 = ON (8-24)
GTG 2 = ON (0-24)
GTG 3 = ON (0-24)
STG = ON (13-24)
Monitoring All Power Plant Manggala
Kondisi Pembangkit PLTGU MUSI II 30 Agustus 2023
Kondisi Operasi Mesin
GTG 1 = ON (8-24)
GTG 2 = ON (0-24)
GTG 3 = ON (0-24)
STG = ON (13-24)
Kondisi Pembangkit PLTM Cibuni 29 Agustus 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = OFF (0-24)
Kondisi Pembangkit PLTM Endikat 29 Agustus 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-21)
Turbine 2 = ON (0-22)
Turbine 3 = ON (0-4)
Kondisi Pembangkit PLTM Lahat 29 Agustus 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-23)
Turbine 2 = ON (0-23)
Turbine 3 = OFF
Kondisi Pembangkit PLTU Baturaja 29 Agustus 2023
Kondisi Operasi Mesin
STG 1 = ON (0-24)
STG 2 = ON (0-24)
Kondisi Pembangkit PLTGU MUSI II 29 Agustus 2023
Kondisi Operasi Mesin
GTG 1 = ON (8-24)
GTG 2 = ON (0-24)
GTG 3 = ON (0-24)
STG = OFF
Kondisi Pembangkit PLTM Cibuni 28 Agustus 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = OFF (0-24)
Kondisi Pembangkit PLTM Endikat 28 Agustus 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-4)
Turbine 2 = ON (0-24)
Turbine 3 = ON (0-19)
Kondisi Pembangkit PLTM Lahat 28 Agustus 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = ON (0-24)
Turbine 3 = OFF
Kondisi Pembangkit PLTU Baturaja 28 Agustus 2023
Kondisi Operasi Mesin
STG 1 = ON (0-24)
STG 2 = ON (0-24)