Kondisi Pembangkit PLTU Baturaja 25 Mei 2023

A. Kondisi Operasi Mesin
STG 1 = ON (24 Jam)
STG 2 = ON (24 Jam)

MaintenanceProgres
1.Pemasangan perancah untuk bongkar insulating kebocoran boiler#1
2.Continue pemasangan Frame / base plate pompa SC#3 untuk pompa baru KSB
3.Daily Boiler, turbin, WTP, CH Auxiliary
4.Suport penggalian titik kebocoran pipa SC area CWP

SPB
-Nihil