Kondisi Pembangkit PLTGU MUSI II 21 Juni 2023

Kondisi Operasi Mesin
GTG 1 = ON (0-16)
GTG 2 = ON (24 Jam)
GTG 3 = ON (24 Jam)
STG = ON (24 Jam)

Maintenance
nihil
SPB
nihil
Dokumentasi

Test Pengoperasian unit baru vacuum purifire ST musi 2.

Leave a Reply

Your email address will not be published. Required fields are marked *