Kondisi Pembangkit PLTM Lahat 5 Juli 2023

Kondisi Operasi Mesin
Turbine 1 = ON (24 Jam)
Turbine 2 = ON (24 Jam)
Turbine 3 = ON (24 Jam)


SPB
Nihil
Maintenance
Perawatan rutin exca 330 cat

Pergantian isolator tumpu dan penggantian kawat ikat dgn side ties

Leave a Reply

Your email address will not be published. Required fields are marked *