Kondisi Operasi Mesin
Turbine 1 = ON (0-23)
Turbine 2 = ON (0-24)
Turbine 3 = ON (0-17)
SPB
Nihil
Maintenance
Perbaikan kuku exca hitachi



Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = ON (0-23)
Turbine 2 = ON (0-24)
Turbine 3 = ON (0-17)
SPB
Nihil
Maintenance
Perbaikan kuku exca hitachi