Kondisi Pembangkit PLTM Cibuni 14 Agustus 2023
Kondisi Operasi Mesin
Turbine 1 = OFF (0-24)
Turbine 2 = ON (0-24)
SPB
- HDPE Geomembrane
- Sika Grout 215
Maintenance
Nihil
Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = OFF (0-24)
Turbine 2 = ON (0-24)
SPB
Maintenance
Nihil