Kondisi Pembangkit PLTM Lahat 24 Agustus 2023
Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = ON (0-24)
Turbine 2 = ON (0-24)
SPB
Nihil
Maintenance
Pemasangan inverter GH





Setting inverter GH



Pengetessan inverter
Pemindahan kabel power control cubikle dr UPS ke inverter