Kondisi Pembangkit PLTU Baturaja 9 September 2023
Kondisi Operasi Mesin
STG 1 = ON (0-24)
STG 2 = ON (0-24)
Maintenance
Mekanik
- Maintenance pompa SC#1 (penambahan gland packing)
- Perbaikan pin arm governur turbine #1
- Lanjut pekerjaan fabrikasi suction pipe pompa ponton#2
- Repair kebocoran line transfer ash silo
- Lanjut install drain mini silo
- Perbaikan line transfer vessel #3
Elektrik
- Senam pagi
- Chek dan perbaikan discharge selenoid botol3 Esp
- Support mekanik Chek power las plasma ash silo
- Support dan pengawasan optimalisasi hoist crane dcs Dengan agenda kerja:
1.Merubah kabel power karena putaran dinamo terbalik
2.pasang sling ke bucket
3.perbaikan brake naik turun bucket
SPB
Nihil
Switching Filter CPC Turbin#1 & turbin#2


Pengencangan pin governor hidrolik valve main steam turbin#1&2



Penggantian glend packing pompa SC#1

perbaikan brake hoist dcs

instal seling bucket

Team subkon, di bantu team PLTU perbaikan optimalisasi Hoist crane DCS 1