Kondisi Pembangkit PLTGU MUSI II 20 September 2023
Kondisi Operasi Mesin
GTG 1 = ON (0-24)
GTG 2 = ON (0-24)
GTG 3 = ON (8-16)
STG = ON (0-24)
SPB
Nihil
Maintenance
PLTG Musi 2, maintenance/pengecatan bgn2 valve drain B#3.

Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
GTG 1 = ON (0-24)
GTG 2 = ON (0-24)
GTG 3 = ON (8-16)
STG = ON (0-24)
SPB
Nihil
Maintenance
PLTG Musi 2, maintenance/pengecatan bgn2 valve drain B#3.