Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Maintenance
Mekanik
- Cleaning area workshop
- 2.Repair kebocoran line transfer ash silo
- 3.Inspeksi pompa Ponton
back up WTP - Repair vessel Tank 3 ESP #1
-Switching T/V #1 ke T/V
#3 - P.M Turbine auxiliary
- Lanjut moving spare parts dari workshop lama dan area room Genset Black Start ( Frame compressor FEIHE )
- Lanjut modif mobil DT
– Install pintu bak - Repair gear drum drive Pulley Conveyor
Elektrik
- Normalisasi Lighting Burner Boiler 2
- Penambahan Lighting Area Tangga Ponton
- Repair Selector Switch TF Valve ESP3
- Continue Normalisasi Control Auto weghing1
- Daily maintenance