Kondisi Pembangkit PLTU Baturaja 21 September 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area workshop
  2. 2.Repair kebocoran line transfer ash silo
  3. 3.Inspeksi pompa Ponton
    back up WTP
  4. Repair vessel Tank 3 ESP #1
    -Switching T/V #1 ke T/V
    #3
  5. P.M Turbine auxiliary
  6. Lanjut moving spare parts dari workshop lama dan area room Genset Black Start ( Frame compressor FEIHE )
  7. Lanjut modif mobil DT
    – Install pintu bak
  8. Repair gear drum drive Pulley Conveyor

Elektrik

  1. Normalisasi Lighting Burner Boiler 2
  2. Penambahan Lighting Area Tangga Ponton
  3. Repair Selector Switch TF Valve ESP3
  4. Continue Normalisasi Control Auto weghing1
  5. Daily maintenance
Muhammad Yusufi

Recent Posts

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago

Kondisi Pembangkit PLTM Endikat 22 Januari 2024

Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTM Lahat 22 Januari 2024

Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…

2 years ago

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago