Kondisi Pembangkit PLTM Lahat 7 Oktober 2023
Kondisi Operasi Mesin
Turbine 1 = On ( O – 24)
Turbine 2 = On ( O – 24)
Turbine 3 = Off
SPB
Nihil
Maintenance
lanjut Normalisasi Downstream bendung.
Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = On ( O – 24)
Turbine 2 = On ( O – 24)
Turbine 3 = Off
SPB
Nihil
Maintenance
lanjut Normalisasi Downstream bendung.