Kondisi Pembangkit PLTU Baturaja 11 Oktober 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area work shop
  2. Inspeksi All Weighing conveyor
  3. Inspeksi kompresor SULLAIR
  4. Repair kebocoran line transfer ash silo.
  5. Rekondisi Pompa Ponton untuk spare
    -Repair Impeller
    -Assembling all parts
  6. Repair anak tangga WTP ( ganti plat bordes )
  7. Perbaikan portal dan pintu gerbang.

Elektrik

  1. Cek jalur pju arah cwp ke workshop
  2. Daily baterai dan transformer
  3. Continue check komunikasi ICP Wtp
  4. Daily Instrument.

SPB

Gasket spiral wound inner CS
DN 150 PN 100
DN 200 PN 100

Leave a Reply

Your email address will not be published. Required fields are marked *