Kondisi Pembangkit PLTM Lahat 19 Oktober 2023
Kondisi Operasi Mesin
Turbine 1 = On ( O – 24)
Turbine 2 = Off
Turbine 3 = Off
SPB
Nihil
Maintenance
-Pengecekkan final drive all exca
-pergantian rubber coupling hydraulic power pack unit 2
Monitoring All Power Plant Manggala
Kondisi Operasi Mesin
Turbine 1 = On ( O – 24)
Turbine 2 = Off
Turbine 3 = Off
SPB
Nihil
Maintenance
-Pengecekkan final drive all exca
-pergantian rubber coupling hydraulic power pack unit 2