Categories: PLTU BATURAJA

Kondisi Pembangkit PLTU Baturaja 14 November 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area workshop
  2. Inspeksi All Weighing conveyor
  3. Inspeksi kompresor SULLAIR
  4. Continue fabrikasi Knalpot W/L
    Install
  5. Maintenance WTP
    Melanjutkan pemasangan plate bordes lanai WTP.
    Perbaikan pompa dosing biocide.
    Melakukan perawatan kompresor WTP
  6. Repair R/S #1B
    Ganti block bearing
  7. Repair kebocoran line transfer ash silo
  8. Prepair penggantian skirt rubber pengarah mulut bunker elv.26.0
    fabrikasi rubber skirt ex B/C
  9. Inspeksi Wet Drain Mixer Main Silo
    Bearing Failure

Elektrik

  1. Penggantian lampu scurity yg mati
  2. Abnormal pju depan office
  3. Continue repair motor Cwp1
  4. Abnormal Ac crusher
  5. Perawatan panel room Elv 7
  6. Daily pressure transmitter dan sensor vaccum boiler

SPB
Nihil

Muhammad Yusufi

Recent Posts

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024

Kondisi Pembangkit PLTM Cibuni 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago

Kondisi Pembangkit PLTM Endikat 22 Januari 2024

Kondisi Pembangkit PLTM Endikat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTM Lahat 22 Januari 2024

Kondisi Pembangkit PLTM Lahat 22 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024

Kondisi Pembangkit PLTU Baturaja 22 Januari 2024 Kondisi Operasi Mesin STG 1 = ON (0…

2 years ago

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024

Kondisi Pembangkit PLTGU MUSI II 22 Januari 2024 Kondisi Operasi Mesin GTG 1 = ON…

2 years ago

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024

Kondisi Pembangkit PLTM Cibuni 21 Januari 2024 Kondisi Operasi Mesin Turbine 1 = ON (0-24)…

2 years ago