Kondisi Pembangkit PLTU Baturaja 15 November 2023
Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )
Maintenance
Mekanik
- Cleaning area workshop
- Inspeksi All Weighing conveyor
- Inspeksi kompresor SULLAIR
- Continue fabrikasi Knalpot W/L
Install - Maintenance WTP
Melanjutkan pemasangan plate bordes lanai WTP.
Perbaikan pompa dosing biocide.
Melakukan perawatan kompresor WTP - Repair R/S #1B
Ganti block bearing - Repair kebocoran line transfer ash silo
- Prepair penggantian skirt rubber pengarah mulut bunker elv.26.0
fabrikasi rubber skirt ex B/C - Inspeksi Wet Drain Mixer Main Silo
Bearing Failures
Elektrik
- Trial motor CWP#1 setelah repair terminasi baru
- Support team HSE warming up diesel generator hydrant
- Relokasi X indoor dan outdoor AC standing di Boiler
- Pengecekan power pump house waterpond dan peneranganya
SPB
Nihil








Penggantian plate bordes dan frame lantai WTP

Relokasi Ac exs trafo BHT1

Support schedule hse warming up hydrant diesel