Kondisi Pembangkit PLTU Baturaja 15 November 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area workshop
  2. Inspeksi All Weighing conveyor
  3. Inspeksi kompresor SULLAIR
  4. Continue fabrikasi Knalpot W/L
    Install
  5. Maintenance WTP
    Melanjutkan pemasangan plate bordes lanai WTP.
    Perbaikan pompa dosing biocide.
    Melakukan perawatan kompresor WTP
  6. Repair R/S #1B
    Ganti block bearing
  7. Repair kebocoran line transfer ash silo
  8. Prepair penggantian skirt rubber pengarah mulut bunker elv.26.0
    fabrikasi rubber skirt ex B/C
  9. Inspeksi Wet Drain Mixer Main Silo
    Bearing Failures

Elektrik

  1. Trial motor CWP#1 setelah repair terminasi baru
  2. Support team HSE warming up diesel generator hydrant
  3. Relokasi X indoor dan outdoor AC standing di Boiler
  4. Pengecekan power pump house waterpond dan peneranganya

SPB
Nihil

Penggantian plate bordes dan frame lantai WTP

Relokasi Ac exs trafo BHT1

Support schedule hse warming up hydrant diesel

Leave a Reply

Your email address will not be published. Required fields are marked *