Kondisi Pembangkit PLTM Endikat 8 Desember 2023

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = ON (0 – 24)
Turbine 3 = ON (0 – 23)

SPB
Nihil
Maintenance

  • ROW tanam rambat pada guying section 2,3 dan 4
  • perbaikan HDPE spacer pd titik 705 – 706 jaringan 33 KV

Leave a Reply

Your email address will not be published. Required fields are marked *