Kondisi Pembangkit PLTM Lahat 22 Desember 2023

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = ON (0 – 24)
Turbine 3 = ON (0 – 24)

SPB
Nihil
Maintenance

  • Normalisasi bendung dengan alat exca 330 dan hitachi 210
  • Instalasi pipa wtp
  • service rutin genset cat PH
  • pergantian batrai backup panel dan pengecekkan akkutec