Kondisi Pembangkit PLTM Lahat 23 Desember 2023

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 20)
Turbine 2 = ON (0 – 22)
Turbine 3 = ON (0 – 1)

SPB
Nihil
Maintenance

  • Normalisasi bendung dengan alat exca 330 dan hitachi 210
  • Instalasi pipa wtp
  • service rutin genset cat PH
  • pergantian oli flywheel ds, nds dan pergantian oli generator ds dan nds

Leave a Reply

Your email address will not be published. Required fields are marked *