Kondisi Pembangkit PLTU Baturaja 2 Januari 2024

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON ( 0 – 24 )

Maintenance
Mekanik

  1. Repair kebocoran pipa transfer dan Ashilo
  2. Repair gearbox rapping & Install
  3. Fabrikasi screen kompresor Sullair
    • Cleaning
  4. -Cek weighing
  5. Repair kebocoran hover transfer botol#2

Elektrik

  1. Perbaikan Tempt Oil Tank Turbine 2
  2. Check Temp inlet Condenser T.2
  3. Merapikan solenoid valve ,panel botol esp
  4. Ganti lampu office
  5. Suport power team mekanik
  6. las pipa transfer

SPB
Nihil