Kondisi Pembangkit PLTM Endikat 9 Januari 2024

Kondisi Operasi Mesin
Turbine 1 = ON (0 – 24)
Turbine 2 = ON (0 – 23)
Turbine 3 = ON (0 – 23)

SPB
Nihil
Maintenance

  • pemasangan guying titik 139 desa lawang agung
    -row tanam tumbuh di section 1

Leave a Reply

Your email address will not be published. Required fields are marked *