Kondisi Pembangkit PLTM Lahat 24 Agustus 2023

Kondisi Operasi Mesin
Turbine 1 = ON (0-24)
Turbine 2 = ON (0-24)
Turbine 2 = ON (0-24)

SPB
Nihil
Maintenance
Pemasangan inverter GH

Setting inverter GH

Pengetessan inverter

Pemindahan kabel power control cubikle dr UPS ke inverter