Kondisi Pembangkit PLTU Baturaja 21 September 2023

Kondisi Operasi Mesin
STG 1 = ON (0 – 24 )
STG 2 = ON (0 – 24 )

Maintenance
Mekanik

  1. Cleaning area workshop
  2. 2.Repair kebocoran line transfer ash silo
  3. 3.Inspeksi pompa Ponton
    back up WTP
  4. Repair vessel Tank 3 ESP #1
    -Switching T/V #1 ke T/V
    #3
  5. P.M Turbine auxiliary
  6. Lanjut moving spare parts dari workshop lama dan area room Genset Black Start ( Frame compressor FEIHE )
  7. Lanjut modif mobil DT
    – Install pintu bak
  8. Repair gear drum drive Pulley Conveyor

Elektrik

  1. Normalisasi Lighting Burner Boiler 2
  2. Penambahan Lighting Area Tangga Ponton
  3. Repair Selector Switch TF Valve ESP3
  4. Continue Normalisasi Control Auto weghing1
  5. Daily maintenance